Files, not data
Program data sits in spreadsheets and network folders. The current revision is whichever file the last person opened.
One data model across the program lifecycle, from acquisition to EOP. A special characteristic entered once in the FMEA reaches the control plan, the work instruction and the SPC chart — without anyone retyping it.
Program data sits in spreadsheets and network folders. The current revision is whichever file the last person opened.
An SC defined in the FMEA is retyped into the control plan, the work instruction and the SPC setup. Every copy drifts on its own schedule.
Lessons learned live in the heads of three senior engineers and in mail threads no one can search.
Two weeks before the IATF audit the team reconstructs evidence from mailboxes instead of pulling it from a system.
Characteristic SC-118 · bore Ø24.5 H7 is declared in the process FMEA. Every station downstream reads the same record.
One data model, not twelve integrations. That is the difference between a platform and a set of modules behind a shared login.
Verifies production capability at the required takt time and produces the run-at-rate evidence PPAP asks for.
Structured quote intake with cost breakdown, feasibility flags and extracted customer requirements.
AIAG-VDA process FMEA where SC/CC assignment carries downstream instead of being retyped.
Program plan, gates and deliverables across the five APQP phases, with owners and dates.
Sourcing, quote comparison and cost analysis against your historical part data.
Control plan generated from the FMEA: characteristics, methods, sample sizes, reaction plans.
Capability and stability monitoring per characteristic, fed straight from the control plan.
Problem solving linked back to the FMEA line and control that let the defect through.
PPAP file assembly with completeness checks against the submission level the customer asked for.
Hour-by-hour production reporting: what the line actually made against what it was meant to make, with OEE, downtime and scrap behind every shortfall.
Customer-specific requirements parsed, versioned and mapped to your internal procedures.
Internal audit planning and evidence collection mapped to IATF 16949 clauses.
12 tools, one session. Access is granted per organization by your ForgeWorkspace administrator.
Copilot reads your program data — retrieval over your tenant only — and works inside the tools you already use. It never approves a document, closes a finding or releases a part.
Flags quoted positions that deviate from the historical cost structure of comparable parts, with the comparison set attached to the finding.
Suggests failure modes and causes from the AIAG-VDA structure and your own historical FMEAs. The engineer accepts, edits or rejects each line.
Reads the RFQ documentation and marks requirements that deviate from the customer's own standard CSR set, before you commit to them.
One characteristic, defined once, propagating into the control plan, the work instruction and SPC.
Every gate, deliverable and open risk for the program in one view, without collecting status by email.
Supplier quotes compared against historical cost structure before the negotiation, not after it.
Program health and launch risk read directly from the system, not from a status deck.